Skip to content

How It Works

How it works

Seven steps from a project brief to a reviewed engineering package.

  1. 1

    Create project

    Name, client, industry, location, water type and purpose.

  2. 2

    Enter water analysis

    Hydraulics and feed water quality, with industry-specific contaminants and custom parameters.

  3. 3

    Resolve missing information

    Validation flags what is required, what is recommended and what looks suspicious.

  4. 4

    Review process alternatives

    Compare treatment trains on performance, risk, data needs and cost tendency.

  5. 5

    Select process

    Choose an option or edit the train directly — add, remove, replace, reorder, add recycle or waste streams.

  6. 6

    Generate deliverables

    Design Basis, Process Description, BFD, Equipment List, consumption and proposal.

  7. 7

    Revise and update

    Change an input, see affected artifacts flagged, and regenerate them as a new revision.